Laserfiche WebLink
............................................ <br />ROADABLE EQUIPMENT sheet 2of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Light Duty Pickup, 4x4, 3/4 T. $34.14 1 $34.14 $34.14 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $34.14 $34.14 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transoortation Cvcle Time <br />Haul time (hours) _ <br />Return lime (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />Nearest major city or town within project area region <br />Non- <br />Roadable Roadable <br />Total one-way travel distance <br />Average travel speed <br />1.62 1.62 <br />1.62 1.62 <br />0.50 NA <br />0.50 NA <br />4.25 3.25 <br />Total non-roadable mob/demob cost <br />'two round trips with haul rig <br />Total roadable mob/demob cost'* <br />"one round trip, no haul rig <br />65.0 miles <br />40.0 mph <br />$2,293.29 <br />$110.97 <br />JOB TIME AND COST ~ Total job time : ~ 8.50 hours <br />Total job cost : $2,404 <br />Montrose <br />