Laserfiche WebLink
nh <br />MINE ID # OR PROSPECTING ID #: ~~-ieRri_nro <br />INSPECTION DATE: 6/~ Smx i INSPECTOR' S INITIALS: KAP <br />OBSERVATIONS <br />1. This inspection was performed to check the condition of the site with regard to a comment contained <br />in the annual report submitted by the operator. Present at the inspection were Kate Pickford, DMG, <br />and Doug Keith, Park County Road land Bridge. Weather at the time of the inspection was cloudy, <br />windy, and approximately 70 degrees. <br />2. The 2006 annual report submitted by Park County for this site stated that the site would be used as a <br />pickup and storage area. Mr. Keithstated that the site would be used as a staging area for a Federal <br />road improvement project on County Road 77, which is scheduled to commence around the date of <br />this report. <br />3. The site is in the same condition <br />materials or equipment are pre. <br />the boundaries are marked. <br />4. As stated in the previous report, alit <br />at this site, one of the stockpiles of r <br />stockpile should be seeded so that <br />I & E Contact Address <br />NAME: <br />OPERATOR: <br />STREET: <br />CITY/STATE/ZIP: <br />it was during the September 15, 2005 inspection. No additional <br />yt the site. An appropriate sign is posted at the mine entrance and <br />Ih the operator is not required to salvage topsoil for reclamation <br />trial is intended for use as topsoil during reclamation. This <br />material is still viable at the time of reclamation. <br />Cc: ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />X Other: David Berry, DMG <br />