My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08566
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:09:18 PM
Creation date
11/18/2007 8:36:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Inspection
Doc Name
DMG MINERALS PROGRAM INSPECTION REPORT
Inspection Date
7/16/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> <br />• (Page 2) • <br />MINE ID # OR PROSPECTING ID # M-77-211 <br />INSPECTION DATE Ju1V 16, 1997 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was made of the Pikeview Quarry to review the status and condition of <br />stormwater manangement structures following the spring runoff season. <br />2. The stormwater mananagement controls at the quarry are funtioning properly and have <br />adequately handled the high volume of runoff during the past two months, even though there <br />still remain several controls to be constructed. <br />3. The operator has done an exemplary job of constructing a sediment pond with riprapped <br />inlet at the bottom of the drainage basin and east end of the permit area. There is also a <br />settling basin and a number of culverts placed in the upper portions of the disturbed area <br />to effectively manage runoff. During the 1997 and 1998 field seasons the operator will <br />continue with construction of stormwater controls in the channel that flows into the sediment <br />pond. The stormwater management plan approved for the site specifies that the channel <br />flowing into the pond will have 3 riprapped drop structures and side slopes that are graded <br />to a stable configuration and revegetated. <br />4. The stormwater controls constructed thus far are intended to be permanent structures. <br />The operator has taken considerable care to maintain them and to ensure that the quality of <br />construction is high. <br />I & E Contact Address cc: Jim Stevens, DMG <br /> ~ CE <br />NAME .Rick Paradav ~ HL <br />OPERATOR Castle Concrete Comoanv ~ FS <br />STREET 3820 N. 30th Street ~ HW <br />CITY/STATE/ZIP Colorado Sorinas, CO 80901 ~ HMWMD (CH) <br /> ~ SE <br /> WQCD (CH) <br /> ~ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.