My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08514
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:09:09 PM
Creation date
11/18/2007 8:36:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986165
IBM Index Class Name
Inspection
Doc Date
12/7/1998
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
11/23/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />NA ~ No portals or shafts created <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.~ Task Description <br />NA ~ No drill holes or monitoring cells created <br />sheet 4 of 4 <br />Lost (S) <br />_________________________ <br />Subtotal (K): <br />Cost (S) <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task Description I Cost (8) <br />4 ~ Demolition assume mass 10'L *5'H *5'u a 80.22/cuf~ S55 <br />2 ~ Seeding per attached task 2 Norksheet ~ 5838 <br />NA I Fencing Not required a[ this time <br />3 ~ Mob/Demob per attached task 3 uorksh eet <br />_____________________________________________________________ 8631 <br />___________ <br />Subtotal (M ): 81,524 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 52,140 <br />II. INDIRECT COSTS <br />_____________________________________________________________ <br />___________ <br />_____________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ___________ <br />Item No.~ Item Description Cost (S) <br />1. Public Liability Insurance.... 1.550% of dir. 833 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ S33 <br />3. ~ Contractor's Profit........... 10.00°!. of dir. ~ 5214 <br />4. ~ Job Superint enden[..equip op serves as super <br />_____________ <br />_____________________________________________ <br />___________ <br />___ <br />Su6t otal (A): 5280 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 52,420 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No. Item Description Cost ($) <br />1. Minerals Program Adm 5.00% of cntr. <br />_________ <br />__ 8121 <br />________ <br />________ <br />________________________________________ <br />__ <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): ___ <br />8121 <br />__________ _ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): ___________ <br />8401 <br />_ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): ___________ <br />82,541 <br />
The URL can be used to link to this page
Your browser does not support the video tag.