My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08478
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:09:02 PM
Creation date
11/18/2007 8:36:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983028
IBM Index Class Name
Inspection
Doc Date
7/5/2001
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/26/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJE <br />Task # <br />Date <br />User <br />04a <br />06/29/2001 <br />SSS <br />State :Colorado PermiUjob# : M-1981-028 <br />County :Montezuma Abbreviation :none <br />Site :Wallace Pit Filename ~ M028-04a <br />Agency or organization name : DMG <br />Permit or other job action :Routine reclamation cost estimate update <br />Task description :Replace stockpiled topsoil over disturbed area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank upper <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br /> Operating cosUhour : $65.98 100 <br /> Ripper op. cosUhour $0.00 0 <br /> Operator cosVhour : $27.99 NA <br /> Total unit cosUhour : $143.48 Total fleet costlhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,067 LCY factor : NA volume: 8,067 LCY <br /> <br />Source of estimated volume :assume 6" placed over 10 acres <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION ~ ~ Job Condition Correction Factors W Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency . 1.10 (Cat HB) <br />Unadjusted hourly production : 291.4 LCYlhr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (l shift/day) <br />Partly consolidated stockpi/e Spoil pile : 0.70 (/nd-mn <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7, 750 feet <br />Material weight ~ 2,100 Ibs/LCY <br />Weight description <br />Earth -Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.938 /LCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />,TION - - - - - <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.10 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.52 <br />Adjusted unit production : 152.92 LCYlhr <br />Adjusted fleet production : 152.92 LCY/hr <br />Total job time : 52.75 Hours <br />Total job cost : $7,569 <br />
The URL can be used to link to this page
Your browser does not support the video tag.