Laserfiche WebLink
Lambert anD ~,~,~ociate,~ <br />_ ~ CONSULTING GEOTECFiNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER M91003MT DATE Thursday, 3/28/91 <br />PROJECT NAME West Elk Coal Mine TECHNICIAN Woods <br />PROJECT LOCATION ylunerset~ WEATHER CONDITIONS sunny <br />CLIENT West Elk WORK REQUESTED Density tests <br />CONTRACTOR West Elk <br />FOREMAN Mr. Kris NikOS <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 10:00 a.m. as requested by Mrs, Kathy Welt of <br />West Elk. I performed soil moisture content and soil density tests as requested by <br />Mrs, Kathy Welt of material being placed on the Gob Pile using nuclear soil density <br />test methods. Please refer to the test results sheet for approximate test locations <br />and test results. The test results were verbally given to Mr, Kris Nikos of West <br />Elk at the time of our site visit. The test locations were determined by Mr. Kris <br />Nikos. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of <br />our site visit. <br />P.O.80X 3986 P.O. BOX OOaS 4b3 TURNEA. 704 A <br />GRAND JUNCTION. CO 87502 MONTROSE. CO 87402 DUAANGO. CO 87307 <br />(303) 2a5~6506 (303) 24921 Sa (303) 2595095 <br />