Laserfiche WebLink
- ~ - Lambert and ~,~,~Oriate~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />D A2 L'f FIELD REPORT <br />PROJECT NUMBER M910O3MT DATE 1/15/91 Tuesday <br />PROJECT NAME Gob Pile ,. TECHNICIAN W, Briggs <br />PROJECT LOCATION Sommerset, CO WEATHER CONDITIONS Cold, overcast <br />CLIENT West E1?c Coal Company WORK REQUESTED Density Tests <br />CONTRACTOR FO REtdAN <br />WORK PERFORMED BY LAMBERT AIdD ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site as requested by Ms. Kathy Welt. I <br />performed soil moisture content and soil density tests as requested by <br />Ms. Welt of material placed on the gob pile using nuclear density test <br />methods. Please refer to the test results sheet for approximate test <br />locations and test results. The test results were verbally given to <br />Ms. Kathy Welt of West Elk Coal the next day. The test locations were <br />determined by Ms. Welt. The test results indicate only the relative <br />compaction and soil moisture content of the material tested at the <br />elevation and location tested at the time of our site visit. <br />P O. BOX 3986 P.O. BOX p0a6 a63 TURNER, 7Oa A <br />GAAND JUNCTION. CO H 7502 MONTAOSE. CO 9 t a02 DURANGO. CD 87307 <br />(303) 245-6506 (303) 2a32t Sa (30.7) 2535095 <br />