Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M- <br />INSPECTION DATE <br />INSPECTOR'S INITIALS GRM <br />The following problems (PB) andlor possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />Corrective Actions: One of the following corrective actions must be chosen: <br />1) The berm could be designed and built to withstand the peak flow from the 100 Year flood event <br />(this would require an amendment to the permit, 2) inflow and outflow structures could be designed <br />and installed which will withstand such an event (this would require a technical revision), or 3) Other <br />solution that the operator may propose to solve the problem. <br />CORRECTION <br />DATE <br />01 / 30 / 04 <br />PB or PV: ~@ <br />TOPIC(S): ~ti <br />SC <br />/ / <br />PB or PV: <br />TOPIC(S): <br />I, Carl B. Mount, hereby certify that on December 2, 2003, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, and to <br />those others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />