Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />1 Good growth of grasses was observed on portions of the "D" Pit area that were drill <br />seeded in the fall of 2003. <br />0 The steep slope roughened seedbed area on the final highwall slope in the "D" Pit area <br />had not yet been re-roughened as requested in the previous inspection, but the operator <br />indicated it was scheduled to be completed within the next week. <br />Minor regrading and topsoiling in southeastern portions of the "D" Pit area was being <br />completed during the inspection. This work was associated with poor reclamation of a <br />topsoil stockpile site and adjacent scraper routes, as described in the previous <br />inspection report. The areas will be reseeded in conjunction with rill and gully repair <br />reseeding. <br />