Laserfiche WebLink
p <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the La Plata Coal Mine for the month of November, 1996. <br />ROADS: The roads that were damaged last July during a severe rainstorm have been reclaimed, <br />reseeded. and mulched with straw. <br />HYDROLOGIC BALANCE: The two major sediment traps have been totally filled in and should <br />be cleaned out before winter prevents any work being accomplished. <br />RECLAMATION SUCCESS: The site continues to do well despite the severe rainstorm earlier <br />this summer. Areas that were repaired should do well next spring. <br />