My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08090
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:07:38 PM
Creation date
11/18/2007 8:34:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
3/7/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />NOV CV-2006-003 was issued from the office on August 29, 2006 for failure to maintain <br />acceptable reclamation bond coverage in the amount determined in accordance with Rule <br />3.02.2(4). The abatement date was originally established as September 15, 2006. On <br />September 18, 2006 the abatement deadline was extended to September 29, 2006 for <br />submittal of the required bond amount of $3,038,059.00. Based on further discussion and <br />written request for extension, on September 29, 2006, the abatement deadline was set as <br />October 27. 2006. <br />The permittee did not submit the required bond amount by the deadline, therefore Cessation <br />Order CO-2006-007 was issued(see below). On November 14, 2006, the Division received <br />an additional letter of credit that when added to the original letter of credit, totaled <br />$3,038,059.00. Therefore, NOV CV-2006-003 was terminated on November 14, 2006. The <br />civil penalty was originally set at $1750.00. An assessment conference was requested by <br />Picketwire Processing and was held on November 16, 2006. As a result of that conference, <br />a settlement agreement was sent to the permittee on November 17, 2006 reducing the <br />penalty to $1250.00. Penalty payment was received on January 29, 2007. <br />The cessation order was issued on October 30, 2006 for failure to abate NOV CV-2006-003 <br />by the extended due date October 27, 2006. The CO was abated and terminated on <br />November 14, 2006 following receipt of a valid letter of credit. A civil penalty in the amount <br />of $1750.00 has been assessed for CO-2006-007 and forwarded to the permittee on <br />December 7. 2006. <br />No violations were issued as a result of this inspection. The cessation order is still pending. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />micoal~snareVOmIS18707 <br />