My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07999
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:07:00 PM
Creation date
11/18/2007 8:34:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
6/26/2003
Doc Name
Inspection Report
From
Cripple Creek & Victor Gold
To
DMG
Inspection Date
6/26/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 2) <br />MINE ID # OR PROSPECTING ID #: ~~-ioan_~ae <br />INSPECTION DATE: ~-~~-n3 <br />INSPECTORS INITIALS: -9fL <br />The Division conducted a monitoring and construction progress inspection of the leach pad facility on 6-30-03. <br />Present during the inspection were, Harry Posey, from the Division Mark Tidquist and Phil Barnes from CC&V. The <br />Physical inspection began around the Phase IV leach pad expansion areas. Both Phil and Mark explained the <br />construction sequence to Harry Posey. The riser pipes for the pregnant solution collection pipes had been <br />extended to accommodate the first ore lift. Operator plans to apply solution in the area, as soon as the <br />temporary pipes and transducer set-ups are in place. The certification report for the PSSA AREA was submitted <br />to the Division on 6-2b-03. The DIVISION is in the process of reviewing the report, however, like in the past, <br />operator was granted to apply solution, before certification approval. The Division was provided weekly <br />construction reports, In addition to physically being present on site, once. a week .All minor changes to the <br />Board, approved plan under Amendment # 8, ware granted by the Division. As in the past, the operator (CC&V) <br />is assuming all the risks, by applying solution, before receiving the written approval. The Division was provided a <br />draft certification report a week before the actual submittal and NO FATAL FLAWS WERE DISCOVERED. <br />The first ore lift was being deployed on the PSSA area, along the west side. Clay liner, geomembrane and drain <br />cover were being deployed at different parts of the leach pad facility expansion areas at the time of the <br />inspection, NO MAJOR PROBLEM NOTED. <br />Inspected the Phase I and II pregnant solution collection areas and recorded the following readings from the <br />High and Low volume solution collection transducers. <br />Phase I high Volume solution collection Transducer # 1 was Fecorded at 24.0 # 2 was at 22.0 and # 3 was of 21.0 <br />Low volume solution collection transducer # 1 was recorded at .14 and # 2 was at .33 <br />Piezometer for the area was at 34 feet <br />Phase II high volume solution collection transducer # 4 was recorded at 26.1 #5 was at 20.4 and # 5 was at 28.6 <br />Low volume solution collection transducer # 1 was recorded at .10 and # 2 was at .61 <br />Piezometer for the area was at 28.6 fast. (ALL TRANSDUCER READINGS ARE IN FEET OF HYDROSTATIC HEAD) <br />Inspected the external pond, it was holding some water, while in the area, collected the following readings from <br />the low volume solution collection Transducers. Transducer # 1 was at 9.6 and # 2 was at 11.40 inches of <br />hydrostatic head. Inspected fhe under drain area, both the South under drain and the 4 inch pipes were <br />discharging, the discharge was being pumped back onto the leach pad. Both the upper and lower ponds were <br />holding some water from the recent rainfall the area received. All surface water diversion structures in the area <br />were in good repair. <br />Continued the inspection to the American Eagle Overlook area, where Phil briefly pointed out to Harry, the <br />different parts of the permit area. Continued the inspection to the East Cresson Area, it was active, no major <br />problem noted. Inspected the Iron clad and Globe hill areas, no major problem noted. <br />I & E Contact Address <br />NAME: MR. PHIL BARNES <br />OPERATOR: CC&V <br />STREET: a ~ a~X 191 <br />CITY/STATE/ZIP: vlcma. cal ~RAn~ Ansnn <br />CC: <br />Harry Posey (e-mail) <br />cc: ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.