My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07884
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:05:47 PM
Creation date
11/18/2007 8:33:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981276
IBM Index Class Name
Inspection
Doc Date
8/1/2002
Doc Name
Inspection Report
From
DMG
To
Wes Hertzog Trucking
Inspection Date
8/1/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 08-Aug-2002 Permit or job no.: M 1981-276 <br />User : GRS Abbreviation : none <br />Filename : M276-000 <br />Agency or organization name : CO DMG <br />Permit or job action :Final Reclamation <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Reduce 660 L.F. 30' Highwall; 0.5:1 to 3.0:1 NA 1 20.0 $2,265 <br />002 -Spread topsoil 12' over l0 acres 16,000cu. yd. x.40/yd3 NA 1 40.0 $6,400 <br />003 -Seed 20 acres@$600.00/acre ~ NA 1 20.0 $12,000 <br />004 -Reslope excess waste piles .SOyd3 x 15000 yd3 NA 2 20.0 $7,500 <br />005 -Mob/Demob NA 2 4.0 $1,000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 104.0 $29, 165 <br />includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Site : Hertzog Pit <br />State :Colorado <br />County :Moffat <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />NA" <br />10.00 <br />TOTAL DIRECT COST' $28,16$ <br />of direct total = $452 <br />of direct total = $306 <br />NA NA total = NA <br />°6 of direct total = $2,916 <br />'not required (or eqp. operator serves as super) TOTAL O & P = $3, 675 <br /> CONTRACT AMOUNT (direct+ O & P) _ $32,840 <br />PROJECT MANAGEMENT- <br />Engineeringwork and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,642 <br />CONTINGENCY ~ NA" NA total = NA <br />'contingencies accounted for at Task level TOTAL INDIRECT COST= $5,317 <br />TOTAL BOND AMOUNT (direct + indirect) _ $34,482 <br />
The URL can be used to link to this page
Your browser does not support the video tag.