Laserfiche WebLink
<br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Coal Gulch Mine for the month of May, 2000. The site is clear of <br />snow and vegetation is starting to grow. <br />Hydrologic Balance: The pond had approximately 4' of water in it but was not discharging. The primary <br />spillway is covered with fill material and is no longer functional. The upper area's low spot has water that <br />is about 10-15 inches deep. The water can only dissipate by evaporation and/or seeping into the ground. <br />Reclamation Success: The site vegetation appears to be doing well at this time. <br />General Mine Compliance: Firehawk Construction Company continues to store equipment and materials <br />outside the 1.03 acres that belongs to them and continues to bring in more junk as needed. <br />