Laserfiche WebLink
- sheet 2 of 2 <br />[VHUHOLC GVf Ulrmur~ <br />Machine Total F4eet Size <br />Description CosUhour/unit (No. units) <br />Haul Trip <br />CosUhr/fleet <br />Return Trip <br />CosUhr/fleet <br />-Generic 15-18 cy, 6x4 $90.01 4 $360.04 $360.04 <br /> <br />-Light Duty Pickup, 4x4, 3J4 7. $46.30 1 $46.30 $46.30 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $406.33 $406.33 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Bayfield <br />Transoortation Cvcle lime : Non- Total one-way travel distance : 7.0 tulles <br />Roadabfe Roadabte Average travel speed : 30.0 mph <br />Haul time (hours) = l 0.23 0.23 Total non-roadable mobldemob cost' : $1,506.60 <br />Return time (hours) = 0.23 0.23 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" : $189.62 <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 1.47 0.47 <br /> <br />~ Total job time : ~ 2.93 hours <br />JOB TIME AND COST Total job cost : $1,696 <br />