My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07654
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:05:16 PM
Creation date
11/18/2007 8:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981158
IBM Index Class Name
Inspection
Doc Date
2/1/2007
Doc Name
Inspection report
From
DRMS whe
To
Forest Lakes Metropolitan District
Inspection Date
7/12/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />Agency or organization name : DRMS <br />Task # : 002 State :Colorado Permitfjob # : M-1981-158 <br />Date : 01/25/2007 County : La Plata Abbreviation :none <br />User : WHE Site :Forest Lakes Pit #1 Filename :M158-002 <br />Permit or other job action :Routine 110c bond review <br />Task description :Replace topsoi10.5' deep over 2 acre area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Trucklloatler team -Truck :Generic 15-18 cy, 6x4 <br />-Loatler :Cat 325C L <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor gratler <br />-Water trunk <br />DSR Series 11 - 8SU <br />Cast Breakdown : _ Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA dozer NA NA <br />Utilization-machine : 100 99 NA 100 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosUhour: $18.41 $39.14 NA $51.18 NA NA <br />Operating cosUhour : $49.85 $46.86 NA $73.75 NA NA <br />Ripper op. cosUhour : NA NA NA $0.00 NA NA <br />Operator costlhour : $21.75 $32.96 NA $32.78 NA NA <br />Unit subtotals: $90.01 $118.96 NA $157.70 NA NA <br />Number of units : 4 1 0 1 0 0 <br />Group subtotals : Work : $479.00 Support : $157.70 Maintenance : $0.00 <br />Total work team cost/hour : $636.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,613 LCY factor: NA ~ volume: 1,613 LCY <br />Material weight <br />Descr.:EaRh -Dry packed : 2,550 pounds/LCY Struck volume : <br />Heaped volume : 15.00 <br />18.00 LCY <br />LCY <br />Rated payload : 63,980 pounds Average volume : 16.50 LCY <br />Payload capacity : 25.09 LCY Adjusted volume': 18.00 LCY <br /> Final truck volume based on number of loader passes : 17.93 LCY <br /> ' (ruck volume atljusted la not exce ed rated payload or heaped volume <br />Loatling Tool Capacity : Job Condition Corrections : Site altitude (ftJ : 7,200 <br />Rated capacity (nom. heaped) : 2.490 LCY ~ Truck ~ Loader Source <br />Descr.:Other -soil, boulders, roots (80 -100%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.900 Job eft ciency : 0.830 0.830 (1 shifUday) <br />Adjusted bucket capacity : 2.241 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.