Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 01/25/2007 <br />User : WHE <br />PermiUjob# : M-1981.158 <br />Abbreviation :none <br />Filename :M158-001 <br />Agency or organization name : DRMS <br />Permit or other job action :Routine 110c bond review <br />Task description :Slope reduction from 1H:1V to 3H:1V <br />HOURLY EQUIPMENT COST <br />County : La Plata <br />Site :Forest Lakes Pit #1 <br />Basic machine :Cat D8R Series !! - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.18 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op.cosUhour : $0.00 NA <br /> Operator cosUhcur : $32.78 ~ NA <br /> Total unit cost/hour : $157.70 Total fleet cosUhour : $157.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,970 LCY factor : NA volume : 1,970 LCY <br /> <br />Source of estima ted volume :See attached drawing, "Slope Reduction" <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Materia! consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.} <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.44 <br />Weight description <br />Sand and grave!-Dry Adjusted unit production : 609.63 LCY/hr <br /> Adjusted fleet production : 609.63 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.23 Hours <br />Unit cost : $0.259 /LCY Total job cost : $510 <br /> <br />State :Colorado <br />