My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07654
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:05:16 PM
Creation date
11/18/2007 8:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981158
IBM Index Class Name
Inspection
Doc Date
2/1/2007
Doc Name
Inspection report
From
DRMS whe
To
Forest Lakes Metropolitan District
Inspection Date
7/12/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 01/25/2007 <br />User : WHE <br />PermiUjob# : M-1981.158 <br />Abbreviation :none <br />Filename :M158-001 <br />Agency or organization name : DRMS <br />Permit or other job action :Routine 110c bond review <br />Task description :Slope reduction from 1H:1V to 3H:1V <br />HOURLY EQUIPMENT COST <br />County : La Plata <br />Site :Forest Lakes Pit #1 <br />Basic machine :Cat D8R Series !! - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.18 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op.cosUhour : $0.00 NA <br /> Operator cosUhcur : $32.78 ~ NA <br /> Total unit cost/hour : $157.70 Total fleet cosUhour : $157.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,970 LCY factor : NA volume : 1,970 LCY <br /> <br />Source of estima ted volume :See attached drawing, "Slope Reduction" <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Materia! consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.} <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.44 <br />Weight description <br />Sand and grave!-Dry Adjusted unit production : 609.63 LCY/hr <br /> Adjusted fleet production : 609.63 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.23 Hours <br />Unit cost : $0.259 /LCY Total job cost : $510 <br /> <br />State :Colorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.