Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and [he termination of violations cited during previous inspections. <br />There were no violations noticed during, and no notice of violation was issued as a result of, this inspection. <br />Notice of Violation (NOV) number CV-2006-006 was issued from the Division office on September 18, 2006. <br />Required abatements dates and dates of abatement are: <br />Abatement Date Re uired b) Date Abated <br />Ste Descri tion <br /> <br />Step 1 Cease discharge of thickener underflow to 13 September 2006 13 September 200b <br /> Sedimentation Pond E. <br />Ste 2 Re air the thickener underflow i e. 13 Se tember 2006 13 Se tember 2006 <br />Step 3 Perform immediate damage control activities on 13 September 2006 13 September 2006 <br /> Foidel Creek. <br />Ste 4 Noti CDPHE, CDO W and the CE of this event. 13 Se tember 2006 13 Se tember 2006 <br />Step 5 Notify downstream water users (demonstrate to the 29 September 2006 22 September 2006 <br /> Division . <br />Ste 6 divided into Ste s 6a throu 6f) <br />Step 6a Assess the Sedimentation Pond E discharge 13 October 2006 13 October 2006 <br /> includes sam lin of the dischaz e) <br />Step 6b Assess the receiving stream water quality of Foidel 10 October 2006 10 October 2006 <br /> Creek and Trout Creek (includes sampling of Foidel <br /> Creek and Trout Creek) <br />Ste 6c Contain the coal fines dischar a 29 Se tember 2006 13 Se tember 2006 <br />Step 6d Assess the potential toxicity impacts, including 6 October 2006 3 October 2006 <br /> documentation of the chemical constituency of the <br /> dischazged material, to Foidel Creek and Trout <br /> Creek <br />Step 6e Provide an estimate of the total slurry (water plus 13 October 2006 13 October 2006 <br /> solids volume dischaz ed to Foidel Creek <br />Step 6f Submit a written report of this information to the 16 October 2006 16 October 2006 <br /> Division <br />Ste 7 Submit coordinated lans for abatement. 10 October 2006 6 October 2006 <br />Step 8 Continue all approved surface water quality 30 October 2006 30 October 2006 <br /> monitoring as required by CDPHE; provide to <br /> CDRMS a copy of the September 2006 DMR for <br /> ermit # 0027154 <br />Ste 9 divided into Ste s 9a and 9b <br />Step 9a Re-establish and document temporary storm water 17 November 2006 17 November 2006 <br /> storage and discharge capabilities consistent with the <br /> a roved desi n <br />Step 96 Remove coal fines accumulation from north pond 31 January 2007 30 January 2007 <br /> area and dis ose of coal fines in existin coal refuse <br />C-1982-056. CP Inspection of 30 January 2007 Page 5 of 6 pages. BG W <br />