Laserfiche WebLink
<br />"~ III 111111111111111! <br />~tambert at1D ~,saaociate,~ 999 <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M95030P1T DATE: q-27-95, Thursday <br />PROJECT NAME: west EiY.Mine <br />PROJECT LOCATION: Somerset, Colorado <br />CLIENT: west Elk Mine <br />CONTRACTOR: <br />I arrived at the project site at 8:00 A.M. as reyuested by Mr. Henry Barbe. <br />I performed soil moisture content and soil density tests as reouested by tAr. <br />Barbe of material being placed on gob pile using nuicear soil density test methods. <br />Please refer to the test results for approximate test .locations and test results. <br />The test results were verbally given to h1r. Henry Barbe of West Elk Mine at the <br />time of our site visit. The test .locations were determined by Mr. Barbe of west Elk <br />Mine. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested af. the time of <br />our site visit. <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />TECHNICIAN:Clendeninq <br />WEATHER CONDITIONS:Overcast <br />WORK REQUESTED: Density Tests <br />FOREMAN: Mr. Henry Barbe <br />At test location LRP-OS there was Eree standing water at anei~i}1t (8) inch death <br />so that density tests were conducted at surface .Leve.L. <br />P.O BOX 3966 <br />GRAND JUNCTION, CO 6f 502 <br />(303) 2a 5 650Fi <br />P.O BOX 0045 <br />MONTROSE. CO 6 t 402 <br />)303) 249 2154 <br />463 TURNER. 104 A <br />DURANGO. CO 61301 <br />(303)2595095 <br />