Laserfiche WebLink
<br />M-99-098 <br />INSPECTOR'S INITIALS CLK <br />/or possible violations (PV) (and suggested corrective <br />his inspection. The problems should be corrected by the <br />possible violations. The possible violations should be <br />reduce their severity when considered by the Mined Land <br />r noted on the previous page should be notified of all <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The ownership and dispositiun of the fence along the western side of the Bagly March 3, 2000 <br />property is unclear. CORRECTIVE ACTION: Determine the ownership of the PB or PV PB <br />fence, and submit clarifying documentation to DMG. This is in accordance with TOPIC(S) AR <br />Rule 6.4.3 (g) of the Construction Materials Rules and Regulmions. <br />2. The missing structures along properties 13 and 12 must be taken into account March 3, 2000 <br />when completing the geotechnical stability analysis. CORRECTIVE ACTION: PB or PV PB <br />Submit eithzr new maps with the structures included, or a letter acknowledging the TOPIC(S) AR <br />presence of these structures and their impact on the geotzchnical stability analysis'. <br />This is in accordance with Rule 6.4.19 of the Construction Materials Rules and <br />Regulations. <br />(Page 3) <br />MINE ID # OR PROSPECTING ID # <br />INSPECTION DATE 2/14/00 <br />The following problems (PB) and <br />actions) were identified during t <br />dates given, or they will become <br />corrected by the dates given to <br />Reclamation Board. The inspecto <br />corrective actions taken. <br />