My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07384
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:47 PM
Creation date
11/18/2007 8:31:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
11/19/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field measurements of pH, temperature and conductance were taken of Trout Creek above and below <br />the permit azea. Results are attached to this inspection form. <br />Backfill and Gradine <br />A Phase I, II, and III bond release in being prepazed by the operator for a reclamation plan option that <br />retains, as permanent, a 3-acre storage area, eliminating backfill and grading associated with removal <br />of the storage area. <br />Topsoil <br />As for backfill and grading, a topsoil replacement task for the 3-acre storage azea would also be <br />eliminated. <br />Fish and Wildlife <br />A large heard of elk were observed on the site. <br />Slides and Damaee <br />A number of the check dams require some maintenance work to restore the structures to original <br />designs. Large pieces of riprap had been placed in a number of the spillway crest sections, and most of <br />this maintenance work has to do with re-establishing the design configuration. A summary of <br />maintenance work identified is as follows: <br />Check Dam <br />Number Level of Effort Work Description <br /> <br />1 None None (deteriorated, but no otential for si nificant increase <br />2 None None (deteriorated, but no otential for si nificant increase) <br />3 Minor Embankment needs to be re aired at b ass of s illwa <br />4 Minor Clears illwa of blocks e b ri ra restore dischar a ca aci ) <br />5 Minor Cleaz s illwa of blocks e b ri ra restore dischar e ca aci ) <br />6 Minor Clears illwa of blocks e b ri ra restore dischar a ca aci ) <br />7 Minor Clears illwa of blocks e b ri ra (restore dischar a ca acit <br />8 Moderate Cleaz s illwa of blocks e b ri ra restore dischaz a ca aci <br />9 Moderate Clear spillway of blockage by riprap (restore discharge capacity), <br />restore embankment at b ass of s illwa <br />10 Minor Embankment needs to be re aired at b ass of s illwa <br />11 Sli ht Clears illwa of blocks e b ri ra (restore dischaz a ca aci <br />12 Sli ht Clears illwa of blocks e b ri ra (restore dischaz a ca acit ) <br />13 Sli ht Clears illwa of blocks e b ri ra (restore dischar a ca aci <br />14 Minor Clears illwa of blocks e b ri ra restore dischar a ca aci <br />Inspection of 19 November 2004, page 4 of 6 pages, 8C9alV <br />
The URL can be used to link to this page
Your browser does not support the video tag.