Laserfiche WebLink
• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-94.087 <br />INSPECTION DATE 7-28-2000 INSPECTOR'S INITIALS SS <br />The following problems (PBI andlor possible violations IPV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will became possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />@CVD <br />CORRECTIVE ACTIONS <br />DATE <br />There is a vertical highwall located on the north side of the east pit, though the 03-17-2000 <br />permit states that mining will maintain final approved slopes. PB ar PV: PB <br />TOPICISI: BG <br />CORRECTIVE ACTION: MP , _, _ <br />Either revise the permit to allow for a highwall to occur on site during mining, or <br />reduce the highwall to the approved final grade aril submit photo~doeumentation of <br />the completed corrective action. Either corrective action must be completed by the <br />date specified to the right. <br />CORRECTION <br />2. The west pit appears to have been completed in 1998, but there is no evidence that -15 , 2000 <br />revepetation tasks have been conducted. PB or PV: PB <br />TOPICIS): R~ <br />CORAECTIVE ACTION: ~ _, _ <br />Specify the status of the mining operation in the west pit. M mining is completed, <br />perform the approved reclamation tasks es soon as weather allows this spring and <br />submit photo-documentation of the completed reclamation tasks by the correction <br />date to the right. <br />3. <br />CORRECTIVE ACTION: <br />PB or PV:_ <br />TOPIC(SI:_ <br /> <br />