My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07301
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:32 PM
Creation date
11/18/2007 8:31:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994081
IBM Index Class Name
Inspection
Doc Date
1/14/2004
Doc Name
Required Corrective Actions
From
DMG
To
Ronald L Barrier
Inspection Date
1/28/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-94.087 <br />INSPECTION DATE 7-28-2000 INSPECTOR'S INITIALS SS <br />The following problems (PBI andlor possible violations IPV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will became possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />@CVD <br />CORRECTIVE ACTIONS <br />DATE <br />There is a vertical highwall located on the north side of the east pit, though the 03-17-2000 <br />permit states that mining will maintain final approved slopes. PB ar PV: PB <br />TOPICISI: BG <br />CORRECTIVE ACTION: MP , _, _ <br />Either revise the permit to allow for a highwall to occur on site during mining, or <br />reduce the highwall to the approved final grade aril submit photo~doeumentation of <br />the completed corrective action. Either corrective action must be completed by the <br />date specified to the right. <br />CORRECTION <br />2. The west pit appears to have been completed in 1998, but there is no evidence that -15 , 2000 <br />revepetation tasks have been conducted. PB or PV: PB <br />TOPICIS): R~ <br />CORAECTIVE ACTION: ~ _, _ <br />Specify the status of the mining operation in the west pit. M mining is completed, <br />perform the approved reclamation tasks es soon as weather allows this spring and <br />submit photo-documentation of the completed reclamation tasks by the correction <br />date to the right. <br />3. <br />CORRECTIVE ACTION: <br />PB or PV:_ <br />TOPIC(SI:_ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.