My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07198
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:24 PM
Creation date
11/18/2007 8:30:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Date
8/15/1996
From
COLO LINING CO
To
COMM INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 6) <br />MINE ID # OR PROSPECTING ID # M-94-117 <br />INSPECTION DATE 8-5-96 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or poeaible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become poeaible violations. The poeaible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />1. Pump had been removed from the tailinc pond sprav <br />evaporation system. Spray evaporation system not operatino. <br />Install replacement pump and operate sprav evaporation <br />daily if there ie sufficient water in the pond. <br />2. Certification of liner repairs by Colorado Lininc Company <br />has not_been provided to DMG. <br />CORRECTION <br />DATE <br />8 / 16 / 96 <br />PB or PV PB <br />TOPIC(S) HB <br />9 / 1 / 96 <br />PB or PV PB <br />TOPIC(S) PW <br />3 <br />Activities by survey crew resulted in new holes in liner. <br />30 / 1 / 96 <br />PB or PV PB <br />TOPIC(S) PW <br />Repair and certify any new liner flaws, holes or ripe. <br />4 <br />9 / 1 / 96 <br />PB or PV PB <br />TOPIC(S) HB <br />5 <br />Resolve perm ittee/ownership issue as described in the <br />observations section of this report. <br />6. The middle decant riser of the three tailino pond decant <br />risers ie not visible in the pond. <br />Locate and repair decant riser. <br />10 / 1 / 96 <br />PB or PV PB <br />TOPIC(S) AR <br />10 / 1 / 96 <br />PB or PV PB <br />TOPIC(S) MP <br />Amply for a well permit and provide a copy of the <br />application to DMG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.