Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Carbon Junction Mine for the month of March,1999. <br />Availability of Records: The records were inspected and found to be satisfactory. Further details <br />of the inspection can be found on page 5 of this report. <br />Hydrologic Balance: All ditches and ponds were inspected and found to be in compliance, both <br />ponds were dry, well vegetated and capable of functioning as designed. All culverts were clear <br />and capable of functioning as designed. Construction of the new drainage system approved by <br />TR-08 is complete. <br />Excess Spoil and Development Waste : Topsoiling of the waste pile is continuing at this time and <br />should be completed sometime in April. The multi-use area had coaly waste put into a small pit <br />and this pit is now ready for reclaiming with the four foot of cover material. <br />General Mine Compliance: The site continues its reclamation efforts and most of the snow has <br />melted from the hillsides. There were no problems were noted during the inspection. <br />