My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC07113
DRMS
>
Back File Migration
>
Inspection
>
INSPEC07113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:04:12 PM
Creation date
11/18/2007 8:30:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Inspection
Doc Date
4/30/1986
Doc Name
VALCO OAKLEAF PIT FN M-84-089
From
VALCO INC
To
MLR
Inspection Date
3/18/1986
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Mr. Mark Loye <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Coloado 80203 <br />Re: Valco - Oakleaf Pit <br />File No. M-84-089 <br />Dear Mark: <br />• <br />VALCO, lNC. <br />PUEBLO CONCRETE DIVISION <br />P. 0. BOX 857 <br />PUEBLO,COLORADO 81002 <br />(303) 561.8350 <br />'~1 <br />AFR 3 0 ' q, <br />15~ i <br />~1~F~S .. . • . ' i <br />This is in reply to your Inspection Report letter of March 18, 1986. As <br />you are well aware, many things have happened since your inspection, including <br />the development of the 112 permit you recommended. I will address the points <br />individually as you raised them. <br />OBSERVATIONS OF II~ORTANCE: <br />1. I have measured what I consider to be the affected area, and in my opinion, <br />it is within the permitted 9.92 acres. However, 1 acre of the buffer zone was <br />disturbed to allow equipment access for placing of riprap to protect the buffer <br />zone, <br />2. The topsoil stockpiles have been shaped at less than a 2:1 slope, and will <br />be seeded 7/i/A of Western Wheatgrass. <br />3. The buffer zone has been protected by riprapping, and is wider than 100' at <br />the narrowest point. <br />RECOMMENDATIONS: <br />1. The 112 permit should be approved at the April Board meeting, and is <br />designed to include all of the present disturbance as well as any other planned <br />additions. VALCO will make every effort to provide the Performance Warranty and <br />Corporate Surety within 2 weeks of notice of Board approval. <br />ROCKY FO RO ~AMAR CANON CITY <br />iii iiiiiiiiiiiuiii~ <br />999 <br />GUNNISON <br />
The URL can be used to link to this page
Your browser does not support the video tag.