My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06992
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:03:42 PM
Creation date
11/18/2007 8:29:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Inspection
Doc Date
9/10/1998
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
8/27/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-81-014 <br />INSPECTION DATE 08/27/98 INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested <br />corrective actions) were identified during this inspection. The problems <br />should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Board. <br />The inspector noted on the previous page should be notified of all corrective <br />actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br /> CORRECTION <br />DATE <br />1. There is an unapproved access road being used in 10/15/98 <br />relation to the pit's activities, which are not in <br />compliance with the approved mine plan. PB or PV:~~ <br /> TOPIC(S): AR <br />CORRECTIVE ACTION: MP ,~p_, <br />The operator must provide any necessary <br />documentation, even if it must be obtained from the <br />party performing the highway construction, to prove <br />that the unapproved pit access is related to the <br />highway construction project, and that this feature <br />is required to be reclaimed at the conclusion of said <br />project. <br />This information must be submitted by the date shown <br />at right. <br />2. None. <br />PB or PV:_ <br />CORRECTIVE ACTION: TOPIC(S):- <br />-' - <br />3. None. <br />PB or PV:_ <br />CORRECTIVE ACTION: TOPIC(S):- <br />-' - - <br />End of report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.