Laserfiche WebLink
Page 1 of 1 <br />Walker, Byron <br />From: Steve Linse [slinse@wwcengineering.com] <br />Sent: Tuesday, July 27, 2004 3:28 PM <br />To: Walker, Byron <br />Subject: Re: Review of Check Dam Inspections, C-1980-001 iusb,•r>l ~ s <br />Byron, ~~ <br />Thanks for taking the time to review the file and document which ponds were dropped and when. <br />At 03:19 PM 7/27/2004 -0600, you wrote: <br />As we discussed by telephone, my review of the subject inspections (chain of <br />peazls) found: <br />Procedure for dropping inspections: Permit Application Package, Appendix <br />4.6-M, Page 8. <br />June 20, 1994. Cover Letter to 2nd Quarter 1994 Inspections, proposed <br />removal of Check Dams 1 and 2 from the inspection schedule. <br />September 26, 1996, 3rd Quarter 1995 Inspections, Check Dam 3 to be removed. <br />September 26, 1996, 3rd Quarter 1996 Inspections, Check Dams 4 and 5 not <br />included. <br />June 18, 1997, 2nd Quarter 1997 Inspections, Check Dams 6, 7, and 8, to be <br />eliminated. <br />Steve Linse, P.E. <br />WWC Engineering <br />Laramie, Wyoming <br />(307)742-OQ31 <br />7/27/2004 <br />