• • (Pa9e 2) • <br />MINE ID # OR PROSPECTING ID # M-83-084 <br />INSPECTION DATE August 22, 1995 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was made of the Snowstorm Placer to evaluate the demolition costs for <br />the water pipeline and supporting facilities as well as the 2nd processing plant located <br />immediately east of the active pit. These costs will be included in the Division's estimate <br />of a current reclamation cost and will be discussed during the meeting with Mr. Free <br />scheduled for August 28, 1997 at 1:30 P.M. in Denver. <br />2. The pipeline consists of 10" diameter heavy PVC for approximately 4,070 linear feet and <br />9" diameter steel pipe for approximately 130 linear feet, totalling 2922 cubic feet. The <br />cost for removal of the pipeline is estimated to be $526 (2922 cu.ft. x 0.18/cu.ft.). The <br />estimated cost to remove the associated pump, generator, fuel tank, and concrete foundation <br />near the fresh water intake is $1,474. Therefore, the total cost for demolition of the <br />pipeline and associated structures is $2,000. <br />3. As noted in the previous inspection report, the operator has begun construction of a 2nd <br />processing plant immediately east of the active pit. There are two (2) concrete slabs <br />totalling approximately 300 square feet. The cost to remove these slabs is $948 (300 sq.ft. <br />x $3.16/sq.ft.). There is also approximately 2250 cubic feet of steel. The cost to remove <br />the steel is $427 (2250 cu.ft. x 0.18/cu.ft.). Therefore, the total estimated demolition <br />cost for the existing structures is $1,375. <br />I & E Contact Address <br />NAME Bernhard Free <br />OPERATOR Snowstorm Sand & Gravel <br />STREET 50928 Hwy 9, P.O. Box 388 <br />CITY/STATE/ZIP Fa irplay, CO 80440 <br />cc: Jim Stevens, DMG <br />~ CE <br /> ~ BL <br /> ~ FS <br /> ^ HW <br /> ~ HMWMD (CH) <br />~ SE <br />~ WQCD (CH) <br />~ OTHER <br />