My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06894
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:03:36 PM
Creation date
11/18/2007 8:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996031
IBM Index Class Name
Inspection
Doc Date
7/3/2002
Doc Name
Inspection Report
From
DMG
To
Sutherland Brothers Inc.
Inspection Date
6/8/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />User <br />SSS <br />Site:WeimerPitNo.2 Filename:M031-03a <br />Agency or organization name :DMG <br />Permrt or other job action :Routine Reclamation Cost Estimate Recalculation <br />Task description :Replace fopsoi/over 8 acres <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost hour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cost hour : $143.48 Total Fl eet cosUhour : $143.48 <br /> <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 LCY factor : NA volume : 6,453 LCY <br /> <br />Source of estimated volume :8 acres covered with 6 inches of topsoil <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 % (i <br />Average site altitude : 5,800 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1 00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.77 <br />Adjusted unit production : 487.31 LCY/hr <br />Adjusted fleet production : 487.31 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 13.24 Hours <br />Unit cost : $0.294 /LCY Total job cost : $1,900 <br />~-.._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.