My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06894
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:03:36 PM
Creation date
11/18/2007 8:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996031
IBM Index Class Name
Inspection
Doc Date
7/3/2002
Doc Name
Inspection Report
From
DMG
To
Sutherland Brothers Inc.
Inspection Date
6/8/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />ern :~g~ ~x <br />NA <br /> Agency or organizaiion name :DMG <br /> Permit or job action :Routine Reclamation Cosf Estimate Recalculation _ <br /> r' - <br />TASKLIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />Ofa -Cut and fill highwall reduction dozer 1 0.4 $57 <br />02a -Rip pit floor ripper 1 12.0 $1,826 <br />03a -Replace topsoiloveraffectedarea dozer 1 13.2 $1,900 <br />04a -Initial seeding with clover revege 1 40.0 $4,824 <br />04b -Revegetate site rovege- 2 40.0 $5,116 <br />05& -Transoort eauiommt to/from site mobilize 4 ~ 2.5 $1,345 <br />• includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />°~a <br />SUBTOTALS : 108,3 <br />TOTAL DIRECT COSY• <br />$1 <br />Liability insurance : 1.55 % of direct total = $234 <br />Performance bond : 1.05 % of direct total = $158 <br />Job superintendent : NA" NA NA total = NA <br />Profit: 10.00 %ofdirect total= $1,507 <br />`not required (or eqp. operetor serves as super) TOTAL O 8 P = $1, 899 <br /> CONTRACT AMOUNT (tlired+08P)= $16,967 <br />PROJECTMANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management andfor administration : 5.00 % of cntr. NA total = $848 <br />CONTINGENCY- NA` NA total= NA <br />contingencies accounted ror at task level <br />TOTAL INDIRECT COST= <br />TOTAL BOND AMOUNT (direct+ indirect) = 517,815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.