• <br />MINE ID k OR PROSPECTING ID ~ M-1987-088 <br />INSPECTION DA-fE 2-18-2000 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PBI and/or possible violations lPV) land suggested corrective actions) were identified during this <br />inspection. The problems should 6e corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br /> DATE <br />The sedirtient pond for Phases I, II, and III is almost non-existent and needs to be 4-28-2000 <br />reconstructed. PB or PV: PB <br /> TOPICISI: HB <br />CORRECTIVE ACTION: _, _, _ <br />Reconstruct the sediment pond, to approved specifications, prior to conducting any <br />other operations at this site, or at least by the correction date noted . <br />2. The mining plan shows a "no mining" area that crosses the center of Phase II where 3-31-2000 <br />a buried ail pipeline was buried. This area has been excavated. P8 or PV: PB <br /> TOPICISI: MP <br />CORRECTIVE ACTION: _, _, _ <br />Provide documentation indicating the transactions occurred between the operator and <br />Williford Energy Company that lead to the mining of this area. <br />3. The Phase I topsoil stockpile is covered with noxious weeds. 4-28-2000 <br /> PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(SI: TS <br />Submit a plan that will be used to address these noxious weed problems. It is _, _, _ <br />recommended that the local weed control agent be contacted and consulted for input <br />into this control plan. The plan should include a thorough visual survey of the site, by <br />a person knowledgeable in weed identification, to identify all noxious weed <br />infestations on the site. <br />4. Reclamation has not taken place concurrently, behind the mining operations, as was 5-12-2000 <br />committed to in the approved permit. PB or PV: PB <br /> TOPICISI: RS <br />CORRECTIVE ACTION: _, _, _ <br />Perform the required reclamation of Phases I, prior to conducting any additional <br />excavation at the site and at least by 5-12-2000. Perform the required reclamation <br />of Phase II prior to initiating excavation of Phase III. Maintain concurrent reclamation <br />throughout the mining operation as specified in the approved permit. <br />(Page 31 • <br />