Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1987-027 <br />INSPECTION DATE 8/24/05 <br />INSPECTOR'S INITIALS RCO <br />The following problems (PB) andlor possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of alt corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The permit boundaries were not adequately marked, though that is required by Rule 10/31/05 <br />3.1.12.. PB or PV: PB <br />TOPIC(S): SM <br />CORRECTIVE ACTION: The operator must mark the boundaries in a durable and _, _, <br />visible manner. Evidence of such marking (such as written note and/or photos) must be <br />received by this office by the date shown at right. <br />2. The annual report maps have not been provided, making the file out-of-date. 10/31/05 <br />PB or PV: PB <br />CORRECTIVE ACTION: The operator must provide an accurate map, drawn by a TOPIC(S): AR <br />person qualified for generating such a map, showing all current disturbance and activity _, _, <br />in the permit area. This map must be received by this office by the date shown at right. <br />The extent and amount of offsite disturbance is suspected but not conclusively known. 10/31/05 <br />PB or PV: PB <br />CORRECTIVE ACTION: The operator must provide a map showing all information TOPIC(S): OD <br />necessary regarding mining-related damage and activity outside the permit area. This _, _, <br />map may accompany the one described in problem #2. This map must be received by <br />this office by the date shown at right. <br />4. Some of the topsoil that was stripped is not being stored adequately to proect it from 12/15/05 <br />deterioration, though the reclamation plan requires it. PB or PV: PB <br />TOPIC(S): TS <br />CORRECTIVE ACTION: The operator must move the topsoil that is stockpiled along _, _, <br />the northern property boundary fence to a location that is in the permit boundary, and <br />configure and treat the pile as described in the body of this report. Evidence of <br />completing this activity must be received by this office by the date shown at right. <br />5. None. <br />CORRECTIVE ACTION: NA <br />PB or PV: <br />TOPIC(S): <br /> <br />