Laserfiche WebLink
' RECLAMATION COST SUMMARY con['d sheet 3 of 9 <br />N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost ($7 <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal IH): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost ($I <br />Subtotal (Il: <br />J. EARTHWORK <br />Task No.~ <br />3 <br />TOPSOIL/SUBSOIL REPLACEMENT <br />Task Description <br />___________________________ <br />Replace topsoil fi beet dirt over 9J acres <br />Cost (5) <br />$18,221 <br />Sub m tal IJ1: 518,221 <br />