Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and the termination of violations cited during previous inspections. <br />Violation CV-2005-005 was issued on May 13, 2005, in two parts. Required abatements of the two parts, <br />including an option in Part 2, aze described (abbreviated) with required abatement dates indicated as follows: <br />Part Descri lion Abatement Date <br /> <br />1 Remove topsoil a setback distance from the sediment control ditch at the 18- <br />Ri ht Ventilation Shaft site. Abated. Ins ected June 14, 2005. 13 June 2005 <br />2a Set back to soil windrows. O lion 2b selected. 13 June 2005 <br />or <br />2b Relocate windrows of to soil to to soil stora a files. 5 Janu 2006 <br />No (new) enforcement actions were taken during this inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />C-1982-056. CP Inspection of October 5, 2005 Page 5 of 5 pages. BGW <br />