Laserfiche WebLink
• (Page 3) • <br />MINE~~ID•# OR PROSPECTING ID # M-94-117 <br />INS YS~~TION~DATE 10/07/98 INSPECTOR'S INITIALS CLK <br />Then the results of moving the tailings could be calculated, as well as the resultant <br />effects on dam stability. <br />7) Christina Kamnikar remained on site while Allen Sorenson and the design engineers from MFG <br />returned to their offices to calculate the new dam parameters. Work was completed on the <br />site at 4:30pm, with all of the organics removed from the north and south ends of the <br />pond, and an area 1/3 the length of the pond left untouched in the center of Phase II. <br />No cracking or sloughing had occurred on the dam by that time, and no visually noticeable <br />changes to dam stability. <br />e) Action was taken during tailings placement to try to prevent creasing and folding of the <br />liner. Sandbacgs were moved and replaced in order to allow for liner drift, and the <br />Operator was informed of the risk to the liner from folding, and asked to have the folds <br />worked out the next morning when the liner had tightened in the cold. The risk of rocks <br />in the pond was also pointed out to the Operator at this time. <br />Work was stopped pending design changes from MFG and approval from the Division. <br />I E E Contact Address <br />NAME Maxine Stewart <br />OPERATOR ITEC Environmental <br />STREET 707 17`" Street. Suite 310 <br />CITY/STATE/ZIP Denver. Co 80202 <br />cc: Carl B. Mount, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWhID (CH) <br />^ SE <br />^ WQCD (CH) <br />^ Other <br />Ted Gengler, ITEC (see above) <br />Will Hamling, ITEC (see above) <br />Tom Marano, ITEC (see above) <br />Larry Cowen <br />McCulley, Frick, and Gilman <br />4900 Pearl E. Circle, Suite 300W <br />Boulder. CO 80301 <br />Mark Steen <br />P.O. Box 1523 <br />Longmont, CO 80502 <br />