Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of March, 2001. The weather <br />conditions at the time of the inspection was clear. <br />ROADS: Roads are well maintained. <br />HYDROLOGIC BALANCE: Both ponds had water in them but were not discharging. All culverts and <br />ditches appear to be capable of functioning as designed. <br />GENERAL MINE COMPLIANCE: The site is well maintained and stable. No problems were noted during <br />the flight. <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water is diverted off <br />the top and into ditches. Work on the backfilling of the lower slope which was cut away still needs to be <br />accomplished. <br />