Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 11/122002 <br />User: SSS <br />State :Colorado Permifrob# : M-1980-003 <br />County :Eagle Abbreviation :none <br />Site :McnultyCinderPit Filename :M003-03a <br />Agency or organization name :OMG <br />Permit or other job action :Routine Reclamation Cost Estimate Update <br />Task description :Spread all available growth medium (topsoil and fines) over site <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,500 <br /> Utilization <br />Ownershipcost/hour : $49.50 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $143.48 Total fleet cost/hour <br />Swell Loose <br />LCY factor: NA volume <br />Source of estimated volume :Estimated <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 300 feet <br />Unadjusted hourly production : 291.4 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (i <br />Average site altitude : 7,500 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />i _ <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.642 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 305 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />$143.48 <br />2,500 LCY <br />Source <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />122 <br />1.00 <br />1.44 <br />1.00 <br />0.77 <br />223.60 LCY/hr <br />223.60 LCY/hr <br />Total job time : 11.18 Hours <br />Total job cost : $1,804 <br />