Laserfiche WebLink
CIRCES Cost EstlmatlnD Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency a organization name :OMG <br />Task#' OSa Stata:Colaetlo PermiVjob #:M-1980.003 <br />Data' 11/132002 County:Eag/e Abbreviation none <br />User- SSS Site: MCnulty Cinder Pif Filename: M003-05a <br />Permit or otherjob action : Rou9ne Reclamafbn Cost Estimate Update <br />Task description :Transport reclamation equlpmenf foHrom fife <br />EQUIPMENT TRANSPORT RIG COST Shia Oasis :1 per tlay <br />Cost date source : CRG Data <br />TrurJC tractor tlesaiption : Generic oMrighway truck tractor, 6x4, tliesel powereq 400 HP <br />Truck trailer tlesaiption :Generic fo/tling gooseneck, drop tleck equipment f2iler (25T, SOT, antl 907) <br />Available rig wPacities : 0-25 Tons 26-50 Tons S1+TOns <br />Cost Breakdown: Ownership cosghouc $24.23 E2832 $30.64 <br />Operetin0 cosMOUr: E30.25 $32.95 <br />Operamr cosMOUr: $2654 $2654 <br />Helper cosMOUr: $2270 82270 <br />Total Unil COSMour: $103.71 $11050 <br />NON-ROADABLE EQUIPMENT <br />Machine WeigNVUnit Ownership Haul Rig Fleet Siza Haul Trip <br />Description (Tons) CosVhdunit CosMr/unit (Na. units) CosMr/geet $34.62 <br />$26.50 <br />$22.70 <br />8114.69 <br /> <br />Retum Trip OOT permit <br />CosUhrHleel CosVgeel <br />-Cal08R-8SU <br />Revegetafion E4vip. 52.22 <br />10.00 $49.50 <br />$10.00 $114.69 <br />$103.71 1 <br />2 $164.20 <br />E227.42 8114.69 <br />E207.42 $OW <br />E000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtofala: 1391.87 ffYY.11 f0.00 <br />EQUIPMENT HAUL DISTANCE and TIM E <br /> Nearest major dty or town within project area region : Gknwnotl Springs <br />Trens0atatian CvUe Time: Non- Total one-way travel tlistar¢e: 20.0 miles <br /> Roadabla RoatlaDle Avaraga travel spaetl: 350 mph <br /> EquiDmem Equipmem <br />Haul lima (hours)= 05] 0.57 Total non+oatlebla mobltlemob cost -: E1,59a 93 <br />Retum time (hours) = 057 057 'two mum Wps wan Iww rN <br />Loatling time (hours) = 0.50 NA Total roetlable mobltlemob mst ^ : E0.00 <br />Unloatling time (trours) = 0.50 NA o~w mma a+o. no new rip <br />Subtotals= 2.14 1.1d <br />JOB TIME AND COST Total job lime: 4.78 hours <br />Total job mst fq~SYY <br />RllanaRt F EONIPMENT <br />