Laserfiche WebLink
a,-09- I'i_i5 l C' I At I FFIUI I Lot 1E~EF:T ASSUC I ATE:, I L~70_d5+=,'b=' <br />~.ambert anD ~~guciateg <br />CONSVLTING GEOT ECHNICAL ENGINEER,'"i ANO MATERIAL TESTING <br />DAILY FIELD REPORT <br />PRO.IECT NUMP,ER: rt96015MT <br />PROJCCT NAnE: Hest Elk Mine <br />PROJEC~( LOCATION: Somerset, Colorado <br />LL I ENT : MOUnfaln Coal ~o~npany <br />CONTP.ACTOR: Mountain Coal Company <br />F' _' <br />DATE: Thursday, 04/16/96 <br />TECHNICIAN: Hayes <br />WEATHER CONDITIONS: Overcastaw <br />Some Rain <br />WORK REQUESTED: Density 'rests <br />FOREMAN : Mr• Henry 6arbe <br />WORK PERFORMED DY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />1 un [rued at the project site ac 10:45 A. M. as requested by !1r. Henry Earbe. <br />? performed coal gob density tests as requested by Mr. Henry Earbe nn material <br />beine placed on the lower refuse pile using nuclear coal gob density test <br />methods. Please refer to Cie teat results sheets for approx xna to test locations <br />and test results. Toe test results indicate only the relative compaction and <br />coal ao:~•'~~~~n store content of the materxa.l tesced at the elevation and location <br />rested ~~._ t~'le time of our site vi>it. <br />v. o. Box 79M1r a. O. Box Does xl~ BODO oft. <br />GRAND JVNGTION. CO E1502 MONTflO5E, C0 81602 OURaNGO. CO E1001 <br />