Laserfiche WebLink
~.allt~lE>'t alto ~$~OL[atE~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M97042MT DATE: Saturday, 5-10-97 <br />PROJECT NAME: <br />PROJECT LOCATION <br />CLIENT: <br />CONTRACTOR <br />West Elk Mine <br />Somerset, Colorado <br />Mountain Coal Company <br />Beavers Construction <br />TECHNICIAN: Casias <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED: Density tests <br />FOREMAN: Mr. Colby Reid <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REMARKS <br />t arrived at the project site at 10:30 A.M, as requested by Mr. Henry Barbe. i <br />performed soil density tests as requested by Mr, Barbe of material being placed for <br />gob pile, backfill, using nuclear soil density test methods. Please refer to the test <br />results sheet for approximate test locations and test results. The test results were <br />verbally given to Mr, Colby Reid of West Elk Mine at the time o£ our site visit. The <br />test locations were determined by Mr, Reid. The test results indicate only the <br />relative compaction and soil moisture content of the material tested at the elevation <br />and location tested at the time of our site visit. <br />v. o. eox a9ee a. o. eox oas 314 BODO DR. <br />GRAND JUNCTION, CO e1507 MONTROSE, CO e140t DURANGO, CO e1001 <br />(970) 245-e508 (970) 24ed154 (970) ZSFSOee <br />