My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC06148
DRMS
>
Back File Migration
>
Inspection
>
INSPEC06148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:02:04 PM
Creation date
11/18/2007 8:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995023
IBM Index Class Name
Inspection
Doc Date
7/5/2002
Doc Name
Bond Calculation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 02-Jul-2002 Permit or job no.: M-1995023 <br />User: KAP Abbreviation: none <br />Filename : M023-000 <br />Agency or organization name :Colorado Division O(Minerals And Geol <br />Permit or job action :Inspection <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Mobilization/demobilization NA 1 5.4 $1,702 <br />002 -Gradehighwalls NA 1 20.3 $2,800 <br />003 -grade topsoil NA 1 27.31 $5,671 <br />004 -revegetation NA 1 10.0 $2,553 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 83.11 $12,728 <br />inclutle5 infla~on factor atljustment of : NA <br />OVERHEAD AND PROFIT <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />Site :Peterson Pit <br />State :Colorado <br />Counry:Jackson <br />TOTAL DIRECT COST'1 $12,726 <br />1.55 % o(direct total = $197 <br />1.05 %o(direct total= $134 <br />31.55 hrs'...$/hr. $33.50 total = $1,057 <br />10.00 %o/direct total= $1,273 <br />assume net hours = 50% of fesk hours TOTAL O 8 P = $2, 861 <br /> CONTRACT AMOUNT (tlirect+08P)= $15,387 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : 4.25 % o(cntr. NA total = 5654 <br />Reclamation management andlor administration : 5.00 % of cntr. NA total = $769 <br />CONTINGENCY- NA' NA total= NA <br />contingencies accounted for el task lave/ TOTAL INDIRECT COST = $4,081 <br />TOTAL BOND AMOUNT (direct + indirect) = 518,810 <br />
The URL can be used to link to this page
Your browser does not support the video tag.