Laserfiche WebLink
• (Page 4) • <br />MIRE, ID # OR PROSPECTING ID # M-9d-117 <br />INSPECTION DATE 05/20/99 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The silt fence below the dam has collapsed, and the surface of the downstream July 28, 1999 <br />face of the dam and the topsoil stockpile need better erosion control. This is in PB or PV PB <br />accordance with Rule 3.1.6.(3) of the Construction Materials Rules and TOPIC(S) SC <br />Regulations. CORRECTIVE ACTION: Fix the silt fence, and stabilize the dam <br />face and stockpile within 60 days, and send photos or descriptions o(same to the <br />Division. <br />2. <br />3. <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />