Laserfiche WebLink
r~ <br />LJ <br />STJTE OF COLD?t90 Au_r:,an n _a!••n ~•,. ~~ <br />DEPARTMENT OF N4TURAL RESOURCES <br />D. Monte Pascoe. Exenit~ve Director <br />11L~'ED L_a`D RECD-~lI_~'TIO~ <br />423 Centennial Building, 1313 Sherman Street <br />Denver. Colorado 60203 Tel. 13031 866-3567 <br />David C. Shelton <br />Director <br />COAL INSPECTION REPORT <br />operation: Bourg Strip Inspection Dace: February 10, 1983 <br />File No.: C-021-61 Type of Operation: UG Surface X <br />Operator Name: Walden Coal Co. <br />Permi ttee Name: Same <br />Address: P.O. Box 229 <br />Federal <br />Private X <br />Boulder, Colorado 80306 <br />County: JdCkSOn <br />Inspector: SUSdn MOWry <br />[leather: partly C10udy, cool <br />Time: 1:30 P.m. <br />Tupe of Inspection: Complete Partial <br />Operator Contact: Walt Ayres <br />I. General Comments <br />Topsoil was being removed in the East Dump area. Removal of overburden and coal <br />was occuring in the pit. <br />The operator was in the process of repairing a clogged culvert. <br />