Laserfiche WebLink
a <br />RED CANYON <br />LIYIiEO LUIILIi1 COY~1111~ <br />3131 Barrett Road <br />Colorado Springs, CO 80926 <br />(719) 576-0563 <br />19 Jan, 2000 <br />Mr. James Dillie <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Corrective Action Submittal, Red Canyon Quarry, M-BS-043. <br />RECEIVED <br />JAN 2 4 2000 <br />Division of Minerals 8 Geology <br />Dear Mr. Dillie: <br />The purpose of this letter is to provide clarification to our 15 Jan, 00, <br />letter to you. Our intent in that letter was to ask for an extension for answering <br />the Potter/Fifield comments and the due date o£ our watershed study. We would like <br />to have an extension on the due date of our watershed study until 21 March, 00. <br />This will give our water engineering firm adequate time to complete this study. <br />Your favorable consideration of this request will be most appreciated. <br />Respectfully, <br />.. <br />C~° ert sta~4lL <br />Manager, R.C.L.L.C. <br /> <br />