Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />This was a partial inspection of the Sunlight Mine conducted by Erica Crosby <br />of DMG. The mine is a bond forfeiture site, therefore, no company <br />representative was present during the inspection. The inspection involved <br />viewing one aerial photograph taken by Harry Ranney of DMG on March 18, 1997. <br />Snow was present on the lower portion of the mine site as well as the upper <br />mine bench. <br />Hvdrologic Balance Snow was scattered throughout the mine site. No major <br />erosion features were noted. <br />Backfilling & Grading The backfilled mine areas show no signs of <br />instability. The crib wall appears intact. <br />