Laserfiche WebLink
this report, the operator has established drainage control, successfully established vegetation, stabilized <br />the lands, and has completed all reclamation obligations set forth in the mining and reclamation permit <br />application. The vegetation appeazs to be adequate for use of the lands for the approved post-mining <br />land-uses of cattle grazing and wildlife habitat. The Division is evaluating the need for ditch <br />renovation and implementation of additional erosion control measures. Upon resolution of the erosion <br />damage, observations made during the inspection would support a finding that the operator has met the <br />requirements for Phase III bond release. <br />7 <br />