Laserfiche WebLink
<br />(Page 3) <br /> <br />MINE ID # OR PROSPECTING ID # M-98-091 <br />INSPECTION DATE 1/8/99 INSPECTOR'S INITIALS AJW <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The operator failed to obtain an approved reclamation 2/10/99 <br />permit prior to engaging in mining operations in PB or PV: PV <br />violation of C.R.S. 34-32.5-109[x, TOPIC(S): RS, <br />AR <br />Corrective actions are to: <br />A. Submit missing or incomplete information and <br />exhibits, as outlined in October 26, 1998 letter <br />from Suzi Erickson of DMG, so that Application M-98- <br />091 can be called complete for technical review. <br />B. Respond to any requests for additional information <br />as required during the technical review so that the <br />application can be approved within 30 days of <br />calling it complete. <br />2 <br />3 <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />