Laserfiche WebLink
• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-77-284 <br />INSPECTION DATE 2/24/99 INSPEC:TOR'S INITIALS WHE <br />The following problems IPBI andlor possible violations (PVI land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they Will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Boanf. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Pursuant to Rule 4.2.1, DMG has reviewed the current cost of recl~~mation and has <br />determined that the existing 512,000 financial warranty is insufficient to ensure re~~lamation. DMG <br />current reclamation cost estimation totals 531,426. <br />CORRECTIVE ACTION Pursuant to Rule 4.2.112-, the operator has 60 days to post additional <br />financial warranty, to total not less than 531,426, from the date of this notit:e of insufficient <br />financial warranty. Please ensure that DMG has received an appropriately executed financial <br />warranty, to total not less than 531,426, by May 21, 1999. <br />2. <br />5/21 /99 <br />PB or PV P~ <br />TOPICIS) FN <br />/ <br />PB or PV _ <br />TOPICIS) _ <br /> <br />lend of report) <br />CERTIFIED MAIL NO. Z 443 190 313 <br />Return Receipt Requested <br />