My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC05366
DRMS
>
Back File Migration
>
Inspection
>
INSPEC05366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:00:01 PM
Creation date
11/18/2007 8:21:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983209
IBM Index Class Name
Inspection
Doc Date
8/10/1998
Doc Name
DMG MINERALS PROGRAM INSPECTION REPORT
Inspection Date
7/29/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 6) • <br />MINE ID # OR PROSPECTING ID # M-83-209 <br />INSPECTION DATE 07/29/98 <br />INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested <br />corrective actions) were identified during this inspection. The problems <br />should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Board. <br />The inspector noted on the previous page should be notified of all corrective <br />actions taken. <br />PROBLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The berm along the ditch structure has been breached, 9/15/98 <br />causing downhill erosion. (This is a pre-existing <br />problem.) PB or PV:PB <br />TOPIC(S):SC <br />The operator must repair the berm to protect areas <br />offsite from further erosion and sedimentation, to the <br />landowner's satisfaction. <br />Proof of completion of this remedial work must be <br />submitted to this office by the date shown at right. <br />2. The mining in the east pit extends deeper than the 12/15/98 <br />ditch, proper drainage has not been maintained, the <br />proper setback has not been maintained to the ditch PB or PV:PB <br />structure, the sideslopes around the pit are too TOPIC(S):MP <br />steep, and reclamation has not been begun in a timely <br />manner in areas where mining has been terminated. <br />These conditions, clearly defined in the permit file, <br />have not been followed in the operation of this site. <br />The operator must perform the needed filling and <br />grading to correct these conditions, plus perform the <br />neede clean up and revegetation described in the <br />narrative of this report. <br />Proof of completion of these items must be submitted <br />to this office by the date shown at right. <br />3. None. <br />PB or PV: <br />TOPIC(S): <br />(enclosure for operator) <br />a:\benton.mon/rco <br />
The URL can be used to link to this page
Your browser does not support the video tag.