Laserfiche WebLink
.~ <br /> <br />I7. Stags o_' 9robiem 3esoiution <br />The followin; items concern problems identified at orevious insgect_on. 'reblems are classi_`:ed <br />into three categories. These are: (1J problems resolv°d; (2) resolution s.i_': `n crocess; and <br />(3) operator delinquent. The dais t.7at the ?roblem s resolved or the date t.^at t.7e operator <br />is deemed delinquent is to be clearly stated. <br />PROBLEM RESOLVED <br />1. AZZ areas have been reseeded as requester?. <br />2. The culvert immediately west of Mann Draw has been cleared. <br />3. A ditch has been constructed around topsoil stockpile B. <br />4. Actual East Dump construction has not begun. Refer to Section ZZ, 4.09. <br />RESOLUTION IN PROGRESS <br />1. Soil conditions remain too moist to work eeuipment on the disturbed area at <br />the Ioadout. ' <br />2. The Division and the operator are wntinuin4 to bring all sediment ponds into <br />compliance. <br />